Product brochure (PDF)
Download the product brochure
All our school district data in one document: what each file contains, example records, how we collect the data, and how orders and licences work.
Every LBUSD bid on PlanetBids since March 2022
The district's "Request for Bids" page states that from 15 March 2022 all district bids are accessible on its PlanetBids site. The vendor information page explains what registration gives you, and is candid about what it does not.
Register on PlanetBids with commodity codes
Suppliers register on the LBUSD PlanetBids portal, choose the commodity codes that describe what they sell, and receive a vendor number by email. Bids for facilities work carry numbers beginning with F or FAC, so a contractor can spot them at a glance.
A better chance of notice, not a guarantee
Registration gives an "increased potential of being notified" of bids in your codes, the district says, but it does not guarantee notice. Check the portal yourself for the categories that matter most to you.
No review of qualifications
LBUSD states that vendor qualifications are not reviewed at registration and that registering is no determination that a company is a responsible vendor. Responsibility is judged bid by bid.
The Purchasing and Contracts Department is at 2201 E. Market Street, Long Beach.
approved by Long Beach voters in three school bond measures since 2008
The district's school bond office lists three measures. Measure K, $1.2 billion, passed with 71% of the vote in November 2008. Measure E, $1.5 billion, passed on 8 November 2016 with 74.86%. Measure Q, $1.7 billion, was approved in November 2022. In 2022-23 LBUSD reported $150 million of capital outlay, $135 million of it construction.
- $1.2BMeasure K, 2008
- $1.5BMeasure E, 2016
- $1.7BMeasure Q, 2022
- $135Mconstruction, 2022-23
Prequalification for large projects
Contractors on projects of $1 million or more must be prequalified through Quality Bidders, according to the district's procedures manual.
CUPCCAA since 2018
LBUSD opted into the California Uniform Public Construction Cost Accounting Act in 2018, which allows informal bidding for mid-sized public works.
Construction is 90% of capital
Of $150 million in capital outlay in 2022-23, $135 million was construction, the rest equipment and other capital items.
Facilities bids are easy to find
On PlanetBids, facilities bids carry an F or FAC prefix in their number.
Four rules from the Purchasing and Contracts manual
LBUSD published the first edition of its "Purchasing & Contracts Policies and Procedures" manual in February 2024. It is linked from the Purchasing page, and these are the parts a supplier meets most often.
Formal bids above the state limit
Equipment, supplies and services are bid under Public Contract Code 20111. The state adjusts the limit each year; from 1 January 2026 it is $119,100. Purchases above that amount are formally bid on PlanetBids; smaller ones follow the district's informal procedures.
- $119,1002026 bid limit
- PCC 20111the statute
CUPCCAA tiers and prequalification
Since opting into CUPCCAA in 2018, LBUSD can bid mid-sized public works informally. The manual's tiers, written before later state adjustments, put informal bids at $60,000 to $199,999 and formal bids above $200,000; check the current figures in each solicitation. Projects of $1 million or more require prequalification through Quality Bidders.
- 2018CUPCCAA adopted
- $1Mprequalification
No contract is valid until the Board acts
The manual states that contracts signed under delegated authority are not valid unless and until they are approved or ratified by the governing board. Extensions of contracts must also seek Board approval. Every contract, large or small, therefore appears on a Board agenda at some point, either before signature or for ratification afterwards.
- Ratifiedby the Board
- Extensionsneed Board approval
Three business days, then fifteen days for a decision
A protest must be filed within three business days of the bid opening for public works, or of the Notice of Intent to Award for everything else. The district decides within 15 calendar days, and an appeal to the Director is due within three business days of that decision.
- 3business days to protest
- 15calendar days to decide
A compact urban district with high building costs
Long Beach is dense, so it spends little on buses and a lot on keeping buildings running and rebuilding them under its bond measures.
Plant operation and construction
Instruction took $736 million, 60.9% of current spending. Plant operation cost $131 million (10.8%), instructional staff support $85 million, pupil support $79 million and school administration $68 million. Food services cost $40 million. Transportation was $16 million, 1.3%, the smallest share of any district on our pages.
California's largest districts by spending, 2022-23
NCES School District Finance Survey, fiscal year 2023.
| District | Students | Total spending | Per student | Capital outlay |
|---|---|---|---|---|
| Los Angeles Unified | 427,795 | $11.49B | $26,866 | $1.14B |
| San Diego Unified | 93,893 | $2.75B | $29,240 | $602M |
| Fresno Unified | 69,668 | $1.60B | $22,998 | $102M |
| Long Beach Unified | 65,554 | $1.47B | $22,456 | $150M |
| San Francisco Unified | 48,785 | $1.25B | $25,632 | $80M |
| Elk Grove Unified | 62,061 | $1.09B | $17,625 | $78M |
Selling to Long Beach Unified
LBUSD gives suppliers a single place to look. Since 15 March 2022 every district bid has been on PlanetBids, and the bid number tells you which office runs it: an F or FAC prefix for Facilities, other numbers for Purchasing and Contracts. A supplier who registers with the right commodity codes, and checks the portal rather than relying only on email notices, will see the district's formal opportunities.
Registration is honest about its limits. The district reviews no qualifications when you register and makes no judgement about whether you are a responsible vendor. That judgement is made when you bid, under the terms of each solicitation, and for public works of $1 million or more it starts with prequalification through Quality Bidders. Construction firms should complete prequalification before the projects they want are advertised.
The ratification rule is useful to anyone tracking the district. Contracts signed under delegated authority are not valid until the Board approves or ratifies them, and extensions must go to the Board. As a result, LBUSD's Board agendas carry a fairly complete record of the district's contracts: new awards, ratifications of smaller contracts, and extensions of existing ones. An extension is a particularly useful signal, because it tells you a contract is being carried forward rather than re-bid, and often for how long.
The bond programme sets the pace for construction and design work. Measures K, E and Q together come to $4.4 billion, and Measure Q, approved in 2022, is the newest and the largest. With CUPCCAA in place since 2018, smaller public works can be bid informally, which gives local contractors a route to work that does not require a full formal bid.
Finally, mind the protest deadlines. Three business days from the bid opening for public works, or from the Notice of Intent to Award for other contracts, is very little time. Bid teams should read the notice the day it is posted.
On the operating side, Long Beach's money comes mostly from Sacramento: 62.6% of its $1.71 billion revenue in 2022-23 was state funding, 24.1% local and 13.3% federal. Its local share is far higher than Fresno Unified's 10.4%. Salaries came to $665 million and benefits to $340 million. What remains of current spending after people, about $200 million a year, is the district's market for supplies, services, utilities and outside contractors, and every contract in it, by the manual's own rule, ends up in front of the Board.
Signals to watch
- New bids on PlanetBids, filtered by F or FAC numbers for facilities.
- Board agendas with awards, ratifications and extensions.
- Measure Q project lists and architect selections.
- The yearly California bid limit and CUPCCAA thresholds.
- The adopted budget for each fiscal year, published on the Financial Documents page.
Long Beach Unified in 2022-23
Selling to Long Beach Unified
Where does LBUSD post bids?
On its PlanetBids portal. Since 15 March 2022 all district bids are accessible there.
Does registration qualify my company?
No. The district does not review qualifications at registration and makes no determination that you are a responsible vendor. Registration only improves your chance of being notified.
What do F and FAC numbers mean?
Bids numbered with an F or FAC prefix are run by Facilities. Other bids are run by Purchasing and Contracts.
When must goods and services be formally bid?
Above the Public Contract Code 20111 limit, which is $119,100 from 1 January 2026.
Who approves LBUSD contracts?
The Board of Education. Contracts signed under delegated authority are not valid until the Board approves or ratifies them, and extensions need Board approval.
How do I protest?
Within three business days of the bid opening (public works) or the Notice of Intent to Award (other contracts). The district decides within 15 calendar days; appeals go to the Director within three business days.
Which bond measures fund LBUSD construction?
Measure K ($1.2 billion, 2008), Measure E ($1.5 billion, 2016) and Measure Q ($1.7 billion, 2022).
Can you supply LBUSD contract records?
Yes. We build LBUSD contract data from Board agendas, with supplier, amount, term and source for each award, ratification and extension.
Where do the numbers come from?
NCES School District Finance Survey for 2022-23, LBUSD's Purchasing and Contracts pages and manual, and its school bond office.
See which LBUSD contracts are being extended
Tell us what you sell. We build the LBUSD awards, ratifications and extensions in your category, with supplier, amount, term and source.
- From Board agendas
- Extensions flagged
- Quote within one business day
