District page · California · San Diego Unified
$602Mof capital outlay in 2022-23,
the fourth-largest of any US district

San Diego Unified RFPs and bids: a district that is always building

San Diego Unified taught 93,893 students in 2022-23 and spent $2.75 billion. Almost a quarter of that, $602 million, was capital outlay, mostly construction. Only New York City, Los Angeles and Chicago spent more on capital. Every solicitation the district issues goes through one free platform, PlanetBids. This page explains how to register, who buys what, and what the 2022 bond means for suppliers.

  • 93,893 students
  • $542M construction
  • $3.2B Measure U, 2022
  • Free PlanetBids registration
San Diego bay and downtown with schools being rebuilt and a crane
San Diego Unified · where the money goes

$1.20 billion on instruction, 61.6% of current spending

San Diego Unified's $1.95 billion of current spending in 2022-23 leaned towards the classroom. Pupil support took $171 million, more than building operations at $153 million.

  • $20,783 per student
  • Source: NCES F-33
San Diego Unified current spending by function, 2022-23
San Diego Unified · bonds

Proposition S, Proposition Z, Measure YY, Measure U

San Diego voters have approved four school bond measures since 2008. The most recent, Measure U, authorised $3.2 billion in November 2022. Long-term debt stood at $5.83 billion in mid-2023.

  • Four bond measures
  • Facilities Planning and Construction
A school under construction

Product brochure (PDF)

Download the product brochure

All our school district data in one document: what each file contains, example records, how we collect the data, and how orders and licences work.

Capital spending
21.9%

of San Diego Unified's 2022-23 spending went on buildings and equipment

Most large districts spend 8% to 12% of their total on capital. San Diego Unified spent 21.9%, $602 million out of $2.75 billion, and $542 million of it was construction. Measured per student, that is $6,406 of capital outlay, more than twice the figure for Los Angeles Unified. For contractors, architects, engineers and the suppliers who fit out finished schools, San Diego is one of the busiest school markets in the country.

  • $602Mcapital outlay
  • $542Mconstruction
  • $6,406capital per student
  • $5.83Blong-term debt, mid-2023

Fourth in the country for capital

Among the 50 largest-spending districts, only New York City ($3.40B), Los Angeles Unified ($1.14B) and Chicago ($762M) reported more capital outlay in 2022-23, and each has between three and nine times as many students.

Debt is rising with it

Long-term debt outstanding rose from $5.55 billion to $5.83 billion during 2022-23, as new bonds were sold faster than old ones were repaid.

Benefits cost almost a third

Benefits of $588 million equalled 30.1% of current spending, a high share for a large district. Pressure on the operating budget does not stop the bond programme, which is paid from separate funds.

Mostly local revenue

56.0% of the district's $2.99 billion of revenue came from local sources, 31.0% from the state and 13.1% from federal programmes.

Capital share of total spendingSan Diego Unified21.9%Seattle19.9%Dallas ISD17.5%Los Angeles Unified9.9%Clark County9.4%
Where bids are posted

One platform for every solicitation: PlanetBids

San Diego Unified has an agreement with PlanetBids to announce and process all solicitations released by its Strategic Sourcing and Contracts Department. The Facilities Planning and Construction department uses the same platform for professional services. Registration is free.

1

Register on PlanetBids

The district's Doing Business page invites suppliers to register, receive automatic announcements and download solicitations at no cost through its PlanetBids portal. Pick your categories carefully; announcements are sent to matching registrants.

2

Strategic Sourcing and Contracts

Goods, general services and most professional services are bought by the Strategic Sourcing and Contracts Department, with a Purchasing and Contracts director as the contact for questions about doing business with the district.

3

Facilities Planning and Construction

Construction and construction-related professional services, such as architecture, engineering, inspection and project management, are let by Facilities Planning and Construction. Its pages tell firms to make sure they are registered on PlanetBids to hear about advertised professional services solicitations, and its business outreach programme publishes guidance for small and local firms.

The City of San Diego and the San Diego Community College District also use PlanetBids, but each has its own portal. Registering with the city does not register you with the school district.

California bid limits for school districtsPublic Contract Code, 2026
PCC 20111Goods and non-construction services
Formal bid above$119,100from 1 January 2026
Previous limit$114,800
Public projects$15,000not adjusted for inflation
Professional servicesSelected on qualifications
Fiscal year1 July to 30 June
ApprovalContracts approved or ratified by the Board of Education

San Diego Unified's bonds and capital, in figures

$3.2BMeasure Uapproved November 2022
4bond measuresS, Z, YY and U, since 2008
$640MMeasure U bonds issuedas reported by the 2024-25 county grand jury
$602Mcapital outlay2022-23
$542Mconstruction90% of capital outlay
$5.83Blong-term debtend of 2022-23
Spending lines

The operating budget behind the buildings

Capital money is spent on projects; the operating budget pays for everything that happens inside the buildings. Here is how San Diego Unified's $1.95 billion of current spending split in 2022-23.

San Diego Unified current spending by function, 2022-23San Diego Unified current spending by function, 2022-23, NCES F-33

Student support is a large line

Pupil support, the health, counselling, psychology, speech and attendance services around the classroom, cost $171 million, or $1,817 per student. That is more than building operations ($1,634 per student) and far more than transportation ($486). Providers of therapy, mental health, special education and attendance services should note how much of the operating budget sits here.

Peers

The districts that spend the largest share on capital

Capital outlay as a share of total spending, 2022-23, among the 50 largest-spending districts. Fast-growing suburbs and older cities rebuilding their schools sit side by side.

Highest capital share

Source: NCES F-33, fiscal year 2023.

DistrictCapitalShare
Charlotte-Mecklenburg$555M23.2%
Katy ISD$341M23.0%
Portland, OR$290M22.2%
San Diego Unified$602M21.9%
Cypress-Fairbanks ISD$392M21.9%
Seattle$279M19.9%
Dallas ISD$514M17.5%

San Diego Unified per student

2022-23, NCES F-33.

MeasurePer student
Total spending$29,240
Current spending$20,783
Instruction$12,812
Capital outlay$6,406
Construction$5,773
Pupil support$1,817
Building operations$1,634

Strategic Sourcing and Contracts

  • Supplies, equipment, technology, food
  • General and many professional services
  • Paid mainly from the operating budget
  • Not where school construction is let
vs

Facilities Planning and Construction

  • New schools, modernisation and repairs
  • Architects, engineers, inspectors, managers
  • Paid from bond measures
  • Business outreach for small and local firms
For sellers

What the numbers say about selling to San Diego Unified

San Diego Unified is a medium-sized district with a very large construction programme. It has fewer students than Clark County, Miami-Dade or Houston, but in 2022-23 it spent more on capital than any of them. Since 2008 San Diego voters have approved four school bond measures, Proposition S, Proposition Z, Measure YY and Measure U, and the district has been rebuilding and modernising schools continuously under them. Measure U, approved in November 2022, authorised a further $3.2 billion.

For construction firms and design professionals, this means a steady flow of work, but also an experienced buyer. Facilities Planning and Construction has run bond programmes for well over a decade and knows the market. Its professional services solicitations, for architects, engineers, inspectors and construction managers, are scored on qualifications, as California law requires, and the firms that win tend to be those with completed school projects in the region. A firm new to the district can start with smaller work, or as a subconsultant or subcontractor on a team that already works for it, and use the department's business outreach programme to learn how projects are packaged.

For everyone else, the starting point is PlanetBids. The district processes all of its Strategic Sourcing and Contracts solicitations there, and registration, announcements and downloads are free. Above $119,100 in 2026, purchases of goods and non-construction services must be formally bid; below that, the district's own policy applies. All contracts must be approved or ratified by the Board of Education, so board agendas show what was bought and from whom after the fact.

Do not overlook the services side of the operating budget. San Diego Unified spent $171 million on pupil support in 2022-23, more than on running its buildings. With benefits at 30.1% of current spending, the district is under pressure to control costs, and contracted services are among the places it looks. A supplier that can show measurable results for students, at a clear price per student, has a stronger case here than one competing on features alone.

Timing follows the school calendar. The fiscal year starts on 1 July, so service contracts and annual licences tend to be awarded in late spring for a July start, and the budget adopted in June sets what is available. Construction that touches occupied classrooms is concentrated in the summer break, which means the design, bidding and board approval for that work happen in the winter and spring before. A contractor that first sees a summer project when the bid is posted in spring has very little time; one that follows the oversight committee and board materials from the previous autumn has months.

Finally, the bond programme is under public scrutiny. A 2024-25 San Diego County Grand Jury report examined the district's bond measures and said voters were not given enough clear information about them. Expect closer oversight committee review, more published detail on project budgets, and contractors asked to document their work more carefully. That is a cost for suppliers, but also a source of public information about what is planned.

Signals to watch

  • New PlanetBids postings from Strategic Sourcing and from Facilities Planning and Construction.
  • Board of Education agendas with award and ratification lists.
  • Independent Citizens' Oversight Committee materials on Measure U projects.
  • New bond sales under Measure U, which fund the next round of construction contracts.

A note on the numbers

Spending, revenue, enrollment and debt come from the NCES School District Finance Survey for 2022-23. Registration and department roles come from San Diego Unified's own Doing Business and Facilities Planning and Construction pages. California bid limits come from California Department of Education guidance. The Measure U amount and bonds issued are as reported in the San Diego County Grand Jury's 2024-25 report.

Questions

Selling to San Diego Unified

How do I register as a San Diego Unified vendor?

Register on the district's PlanetBids portal. The district says registration, automatic announcements and solicitation downloads are free.

Who buys construction services?

Facilities Planning and Construction. It also advertises its professional services solicitations through PlanetBids.

When must the district bid formally?

For goods and non-construction services above $119,100 in 2026, and for public projects above $15,000, under the California Public Contract Code.

Who approves San Diego Unified contracts?

The Board of Education. California law requires a district's contracts to be approved or ratified by its governing board, and the board's agendas list awards and ratifications in public.

Why is capital spending so high?

Because the district has been rebuilding and modernising schools under a series of voter-approved bonds since 2008. In 2022-23 capital outlay was $602 million, 21.9% of total spending.

How big is Measure U?

$3.2 billion, approved by voters in November 2022. The county grand jury reported $640 million of Measure U bonds issued at the time of its 2024-25 report.

Is the City of San Diego's PlanetBids the same?

No. The city, the community college district and the school district each have their own PlanetBids portal and registration.

Where do these numbers come from?

NCES School District Finance Survey for 2022-23, the district's own pages, the California Department of Education and the San Diego County Grand Jury.

San Diego Unified data

Follow San Diego Unified's projects and awards

Tell us what you sell. We send San Diego Unified awards and ratifications in your category, with dates and sources, and the same for other California districts.